DRAINAGE Drainage outlets visible from the 2nd floor: Kitchen sink drains into 1 1/2 inch wye 2nd floor bathroom sinks drain into 1 1/2 inch double wyea 0892 Drainage outlets visible from the 1st floor: 2nd floor tub drains into 1 1/2 inch pipe. 0897 2nd floor toilets drain into 3 inch double wye. 0900 0908 0910 0911 0912 1st floor bathroom sinks drain into 1 1/2 inch double wye. 0905 0906 2nd floor shower drains into 2 inch pipe. Drainage outlets visible from the basement: 1st floor tub drains into 1 1/2 inch pipe. 0922 0923 0924 0936 1st floor toilets drain into 3 inch double wye. 0913 0914 0938 1st floor shower drains into 2 inch pipe subsurface tank contents pumped into 1 1.2 inch pipe. 1010 Drainage mergers: 2nd floor: 2nd floor bathroon sinks drain into double wye 0809 1st floor: Bathroom sink drainages from second and first floor merge 0902 Basement: 1 1/2 inch kitchen sink drainage from 2nd floor enters 2 inch tail of sewer. 0933 0934 1 1/2 inch drains from 2nd floor and 1st floor tubs merge in a 2 inch wye which drains into 2 inch sewer tail. 0923 0924 0932 0935 0936 2 inch drains from all 4 bathroon sinks merge with 2 inch sewer tail to form 3 inch sewer. Sump ejects into 1 1/2 inch pipe which is enlarged to 2 then 3 inch pipes. The 2" drainage from the two showers enters a 3 inch pipe 0941 at the end of the 4 inch main sewer. Drain from 3 inch double wye serving 1st floor toilets merges with three inch toilet drain from 2nd floor to form 4 inch sewer 0913 0914 which merges with the other 4 inch drain to form main sewers 0982 from which the main 3 inch vent stack rises before the sewer exits the foundation wall.