After only 5.5 hrs sleep in bed, I'm only now about to start working. Have been sleeping in the chair for several hours. Without a printer, I would have to copy by hand your schedule of doors to go through the house recapitulating each prospective installation in my mind. It's on my to-do list after the wiring is complete. I feel strongly that nothing more should be ordered until at least the flooring is in place, because for Tim to work efficiently he needs the space which would be taken up by the storage for future installation of doors, baseboards and molding. I've given much thought an anxiety to the design of each of the four bathrooms, which, unless we both are both thoughtful and fortunate may turn into, - what my parents' friend and patient Ella Bruell called, "eine große Enttäuschung." I will try to give you all the help I can - if you want it. ==> Before the flooring is installed, the 60 ceiling light fixtures should be routed to the required dimensions for the trim; else protecting the white oak against the ensueing plaster dust will cause an inordinate amount of extra work. Should I ask Jim Barros to do the necessary routing? or Tim LeBlanc? I hope you are well. I'll write again later, - I hope after having gotten much work done.